MarineTalk
Home Page
About MarineTalk
Buyer's Guide
World InfoDesk
Discussion Forums
Advisory Board
FAQ
Advertising Information
Submit Company Listing
Edit Company Listing
Site Map
 
MarineTalk Site Search:

Powered by Google



World InfoDesk Articles
Buyer's Guide Companies

RELATED ARTICLES:
Containing similar keywords/phrases

- development.
- preliminary design
- drug interdiction
- electrical design
- logistics support
- northrop grumman
- lockheed martin
- communications
- demonstrations
- reconnaissance
- us coast guard
- communication
- demonstration
- fast response
- joint venture
- communicatio
- intelligence
- interdiction
- ship systems
- surveillance
- coast guard
- exceptional
- new orleans
- operational
- preliminary
- ship system
- the command
- capability
- mechanical
- near shore
- sufficient
- computers
- deepwater
- fisheries
- logistics
- milestone
- presented
- resulting
- scheduled

Fast-Response Cutter Design Progress

      5/31/2005


Interactive Format for ShipRepair & Conversion
Construction of the Amphibious Transport Dock Ship
New Policies for Cruise Ships

Fast-Response Cutter Design Progress


The U.S. Coast Guard's innovative, 140-foot fast-response cutter has reached a systems requirements milestone resulting in the ship being one step closer to construction commencement. The fast-response cutter is being built by Integrated Coast Guard Systems (ICGS), a joint venture between Northrop Grumman and Lockheed Martin, under the Integrated Deepwater System Program. The purpose of the systems requirements review was to present the ship concept to the Coast Guard and to confirm the customer requirements have been sufficiently developed, so the ICGS team can proceed to design development.

Fast-Response Cutter Design Progress

The cutter will be interoperable with other Deepwater assets and will operate at 30+ knots, providing exceptional response and reaction capability. Typical missions will include near-shore fisheries patrol, migrant and drug interdiction, barrier patrols and augmenting patrols in areas of concern. The systems requirements review, held at Northrop Grumman Ship Systems sector's shipyard in New Orleans, included demonstrations on the fast-response cutter's hull, mechanical and electrical design, the command, Control, Communications and Computers, intelligence, Surveillance and Reconnaissance (C4ISR) suite and logistics support. ICGS also presented information on the ship's preliminary operational plans. As a result of the systems requirements review process, the Fast-Response Cutter program now moves into the preliminary design phase, with the customer review scheduled for this August.


 

About the Company



Article Kewords/Phrases:

U.S. Coast Guard fast-response cutter ICGS Northrop Grumman Lockheed Martin Deepwater System Program Deepwater assets near-shore fisheries patrol Ship Systems electrical design, the Command, Control, Communications and Computers, Intelligence, Survei, development., , preliminary design, drug interdiction, electrical design, logistics support, northrop grumman, wwwmarinetalkcom, lockheed martin, communications, demonstrations, reconnaissance, us coast guard, communication, demonstration, fast response, joint venture, marinetalkcom, communicatio, intelligence, interdiction, ship systems, surveillance, coast guard, constructio, exceptional, information, new orleans, operational, preliminary, requirement, ship system, the command, capability, marinetalk, mechanical, near shore, sufficient, computers, deepwater, developme, fisheries, formation, informati, logistics, milestone, presented, providing, resulting, scheduled, e c






MarineTalk | About MarineTalk | Buyers Guide | Infodesk | Site Map
Discussion Forums | Advisory Board | FAQ | Submit Company Listing | Edit Company Listing
A list of all News and Technology Articles
Buyer's Guide Companies





MarineTalk
MarineTalk a Division of Scientia Technologies Corporation


E-mail: 

Copyright © 1998 - 2008 Scientia Technologies Corporation
All rights reserved.

The reproduction, retrieval, copying or transmission of this Web site content,
in whole or in part, is not permitted without the express permission of
MarineTalk .