MarineTalk
Home Page
About MarineTalk
Buyer's Guide
World InfoDesk
Discussion Forums
Advisory Board
FAQ
Advertising Information
Submit Company Listing
Edit Company Listing
Site Map
 
MarineTalk Site Search:

Powered by Google



World InfoDesk Articles
Buyer's Guide Companies

RELATED ARTICLES:
Containing similar keywords/phrases

- risk based inspection
- productionoffloading
- floating production
- training program
- consequences
- implementing
- abs classed
- engine room
- inspections
- offloading
- portuguese
- risk based
- structural
- beginning
- certified
- component
- extensive
- five year
- frequency
- implement
- operating
- personnel
- petrobras
- ship hull
- on board
- on off
- x y

Integrated Risk-based Inspection Contract

      10/17/2000


Bender Shipbuilding Expands to Mexico
'End of an Era' at Belfast Shipyard
Solving Pollution at Sea

Integrated Risk-based Inspection Contract


ABS Group Inc. (ABSG), an affiliate of ABS, has secured contract for an integrated, risk-based inspection (RBI) program for an offshore floating structure. The contract comes from Petrobras for its P-35 floating production/offloading and storage facility (FPSO) operating in the Campos Basin offshore Brazil – Marlin Field in 2,788 feet of water. The P-35 is ABS-classed and has a design capacity to process 100,000 barrels of oil per day.

The integrated RBI of the P-35 will include the marine/process systems, structural components, ship hull and turret in a single program. Built in 1974, the P-35 is classed +A1, AMS for machinery and ACCU for automatic control certified for an unattended engine room.

The six-year contract includes the development of a risk-based inspection plan in the first year plus a five-year maintenance of the inspection program.ABSG will execute the project in four phases, beginning with a qualitative review of all P-35 systems and components. The second phase will include a quantitative analysis of all systems, looking at the frequency or likelihood of equipment failure and the consequences of a failure. In the third phase, ABSG will develop a complete set of inspection plans, prioritizing inspections based on the qualitative and quantitative analysis. ABSG will begin the fourth phase—the five-year maintenance program—by October 2001.

Integrated Risk-based Inspection Contract

An extensive RBI training program will kick off the entire process. All training will be given in Portuguese, in Brazil, beginning with RBI training to senior Petrobras personnel. ABSG will then train Petrobras field personnel in terms of implementing the RBI program on board the P-35.ABSG will implement the RBI program on the Petrobras web Intranet.


 

About the Company



Article Kewords/Phrases:

ABS Group Inc. ABSG risk-based inspection offshore floating structure Petrobras RBI Marlin Field oil marine process systems , risk based inspection, productionoffloading, floating production, training program, wwwmarinetalkcom, marinetalkcom, consequences, implementing, abs classed, engine room, inspections, maintenance, marinetalk, offloading, portuguese, risk based, structural, beginning, certified, component, developme, extensive, , five year, frequency, implement, operating, personnel, petrobras, ship hull, on board, on off, e c, x y






MarineTalk | About MarineTalk | Buyers Guide | Infodesk | Site Map
Discussion Forums | Advisory Board | FAQ | Submit Company Listing | Edit Company Listing
A list of all News and Technology Articles
Buyer's Guide Companies





MarineTalk
MarineTalk a Division of Scientia Technologies Corporation


E-mail: 

Copyright © 1998 - 2008 Scientia Technologies Corporation
All rights reserved.

The reproduction, retrieval, copying or transmission of this Web site content,
in whole or in part, is not permitted without the express permission of
MarineTalk .