Load Planning for Platform Supply Vessels
BMT Fluid Mechanics (UK) has announced the first installation of a new cargo arrangement planning system, Platform Supply Vessel - Cargo Arrangement Planning System (PSV-CAPS). The system, to be installed at the marine base of a major offshore operator, will assist the load planning of platform supply vessels (PSVs), and replaces the Unix DECKPLAN system that has been in use for several years. PSV-CAPS has a user-friendly Windows interface and is a complete redesign and rewrite for Windows XP. |
If PSV loading is not planned carefully important cargo can sometimes be left behind, and cargo is not always conveniently grouped and located on deck to enable safe unloading in the field. Furthermore, operators may not always have complete confidence that hazardous cargoes have been properlysegregated according to the International Maritime Dangerous Goods (IMDG) Code. PSV-CAPS helps the operator to address and resolve these issues quickly and efficiently. PSV-CAPS enables users to: |
|
|
About the Company
|
Article Kewords/Phrases:
BMT Fluid Mechanics (UK) new cargo arrangement planning system load planning of platform supply vessels (PSVs) Unix DECKPLAN system International Maritime Dangerous Goods (IMDG) Code. PSV-CAPS , on requirements., platform supply vessels, international maritime, wwwmarinetalkcom, dangerous goods, fluid mechanics, hazardous cargo, planning system, supply vessels, documentation, international, marinetalkcom, supply vessel, user friendly, internationa, transmission, appropriate, arrangement, authorities, destination, efficiently, requirement, confidence, convenient, facilitate, marinetalk, separation, announced, carefully, dangerous, efficient, graphical, hazardous, imdg code, important, installed, interface, mechanics, retention, unloading, , e c, m s
|
|