Unique Offshore Support Vessel
 
Advertise Here
Trending Topics:
Sunday, June 14, 2015

Ship Equipment
Ship Maintenance
Unitor
Ship Systems
Bimco
Worldwide Metric
Portvision
Hydroscan
Freeman Marine
Neptune Group

MarineTalk
Home Page
About MarineTalk
Buyer's Guide
World InfoDesk
Discussion Forums
Advisory Board
FAQ
Advertising Information
Submit Company Listing
Edit Company Listing
Site Map
 
MarineTalk Site Search:
Featured Companies

Marine Surveyor
I Vineet ranjan Srivastava ( Prop of M/s V R & Associates ) working as Independent Marine Survey, Ship safety Inspection approved from Panama for panamian Flag ship as well all marine related work at Port having 17 yrs exposure in this field in India
    India

CEFOR - Central Union of Marine Underwriters
The objective of the Central Union of Marine Underwriters (CEFOR)is to promote and safeguard the professional and economic interests of its members within hull, energy and cargo insurance.
    Norway

Centre for Coastal and Marine Science
CCMS is a public sector research organisation, carrying out R&D in oceanography. Our science is carried out in 6 Core Strategic Research Programmes, see http://www.ccms.ac.uk/ccms.htm for details.
    United Kingdom

MARPOL Training Institute, Inc.
We provide superior DNV certified computer-based training systems and consulting covering MARPOL Regulations, Waste Management Best Practices and the US EPA NPDES Regulations.
    USA California

Unique Offshore Support Vessel

      1/25/2002

Unique Offshore Support Vessel

British Maritime Technology’s (BMT) subsidiary BMT Shipdesign had won the contract to design a revolutionary multi-role oil field support vessel. Designated SWIMSS (Shallow Water, Ice Management, Supply and Standby) the vessel will be used in the Kashagan field, in the Caspian Sea off the coast of Kazakhstan. BMT Shipdesign is working with Ulstein Verft for the Scottish offshore company BUE Marine Ltd. Preliminary design work began in August 2001 and the vessel will arrive in the Caspian Sea in the middle of November 2002.

There are several design challenges which make this project unique. The water around the Kashagan field is very shallow and, while in the summer the weather is very hot, in the winter the sea freezes over. To account for this the vessel must be able to operate at air temperatures ranging from plus 40° C to minus 30° C, sea temperatures ranging from minus 1°C to 32°C and break ice up to 60 cm thick ahead and 1m astern. The draught must not exceed 4 metres under normal operation and 2.5 metres when icebreaking in shallow water.

The building and delivery of the vessel also pose huge challenges for the project team. The entire hull, with the exception of the superstructure, will be built in Poland and will be towed to Ulstein Verft at Ulsteinvik for outfitting. Once outfitted the vessel will be transported through Russia’s canal system to arrive in the Caspian Sea in September 2002. Tight project timescales must be adhered to since the canals close for the winter in October each year.


 

About the Company

You may also like:
Trending Technology, World Shipping & Maritime News





Latest Marine News and Technology Articles | Maritime 2015 Buyer's Guide





MarineTalk

E-mail:  Contact Us

Copyright © 1998 - 2015 MarineTalk
Division of Link Internet Business Solutions
All rights reserved.

The reproduction, retrieval, copying or transmission of this Web site content,
in whole or in part, is not permitted without the express permission of
MarineTalk .