World's First LNG FPSO
 
Advertise Here
Trending Topics:
Sunday, June 14, 2015

Ship Equipment
Ship Maintenance
Unitor
Ship Systems
Bimco
Worldwide Metric
Portvision
Hydroscan
Freeman Marine
Neptune Group

MarineTalk
Home Page
About MarineTalk
Buyer's Guide
World InfoDesk
Discussion Forums
Advisory Board
FAQ
Advertising Information
Submit Company Listing
Edit Company Listing
Site Map
 
MarineTalk Site Search:
Featured Companies

HELMEPA - Hellenic Marine Environment Protection Association
HELMEPA was founded by the representatives of the Panhellenic Seamens' Federation and the Union of Greek Shipowners who on June 4, 1982 co-signed the joint Declaration of Voluntary Commitment "To Save the Seas".
    Greece

Ferry Management Services Limited
www.ferrynews.com is a new website brought to you by ferry industry professionals, Ferry Management Services & Seatrade. Hyperlink Market Intelligence will take you to a 50,000 word database of global ferry information referenced by operator.
    United Kingdom

The Nautical Institute
The Nautical Institute is the world's leading international professional organisation for qualified Mariners. Its principal aim is to promote high standards of knowledge, qualification and competence amongst those in control of seagoing craft.
    United Kingdom

Society of Maritime Industries
We are the primary UK trade association for companies in the industrial marine supply chain. We promote our members' interests with Government, the European Commission and our industry partners in the wider maritime sector.
    United Kingdom

World's First LNG FPSO

      9/24/2007

World's First LNG FPSO

Höegh LNG announced that it has entered into agreements with major contractors and formally started the engineering and design for its first LNG FPSO Unit (Floating Production Storage and Offloading), with the objective to design and construct the worlds’ first LNG FPSO. The company intends to develop its business model from pure LNG transportation into offering also solutions for LNG production and floating regasification terminals offering a complete offshore LNG supply chain.

The proposed project will consist of a ship shaped offshore classed structure with the capacity to treat and liquefy a well stream of approx 2.5 billion cubic meters pr. year, which will give an annual production of approx 1.6 million tons of LNG and approx 0.5 million tons of LPG. The LNG FPSO will have storage capacity of 180 000 cubic meters of LNG and 30 000 cubic meters of LPG, and the first delivery is stipulated for mid 2011.

The project (Pre-FEED) is managed and owned by Höegh LNG, with Aker Yards performing the work for the FPSO hull, containment and utility systems, and ABB Lummus Global doing the design work for the gas treatment and processing plant as well as the liquefaction and LPG plant. Agreements with contractors for the LNG offloading, and mooring arrangements as well as the classification society will be completed shortly. The design for the containment system is Aker Yards and Aker Kværner’s proprietary new Aker Double Barrier Tank LNG containment system., and the liquefaction technology is based on ABB Lummus Global’s proprietary “NicheLNGsm Turbo Expander” system. The Pre-FEED will take 4-6 months to complete.


 







Latest Marine News and Technology Articles | Maritime 2015 Buyer's Guide





MarineTalk

E-mail:  Contact Us

Copyright © 1998 - 2015 MarineTalk
Division of Link Internet Business Solutions
All rights reserved.

The reproduction, retrieval, copying or transmission of this Web site content,
in whole or in part, is not permitted without the express permission of
MarineTalk .