Advertise Here
Trending Topics:
Wednesday, February 08, 2012

Ship Equipment
Ship Maintenance
Unitor
Ship Systems
Bimco
Worldwide Metric
Portvision
Hydroscan
Freeman Marine
Neptune Group

MarineTalk
Home Page
About MarineTalk
Buyer's Guide
World InfoDesk
Discussion Forums
Advisory Board
FAQ
Advertising Information
Submit Company Listing
Edit Company Listing
Site Map
 
MarineTalk Site Search:
Featured Companies

Chemical Carriers Association
CCA is devoted to promoting regulatory compliance and safety in the bulk waterborne transportation of chemicals and other hazardous materials. The CCA membership complement presently includes:
    USA District of Columbia

O.E. ENTERPRISES
Leading Manufacturer of underwater loudspeakers and underwater speakers for use in diver recall systems, underwater High Powered Communication Systems and synchronized swimming sound systems. Also used in marine mammal research and aquariums.
    USA Ohio

DECKadence Marine Flooring
DMF is a revolutionary material manufactured from the most practical marine flooring material in existence today. DMF is the right combination of PVC, Resign and Aerated Rubber designed to deliver comfort and durability to boaters worldwide.
    USA Florida

FAME Maritime Foundation, Inc.
Provide quality training and education in the Maritime Profession.
    Philippines

World's First LNG FPSO

      9/24/2007

World's First LNG FPSO

Höegh LNG announced that it has entered into agreements with major contractors and formally started the engineering and design for its first LNG FPSO Unit (Floating Production Storage and Offloading), with the objective to design and construct the worlds’ first LNG FPSO. The company intends to develop its business model from pure LNG transportation into offering also solutions for LNG production and floating regasification terminals offering a complete offshore LNG supply chain.

The proposed project will consist of a ship shaped offshore classed structure with the capacity to treat and liquefy a well stream of approx 2.5 billion cubic meters pr. year, which will give an annual production of approx 1.6 million tons of LNG and approx 0.5 million tons of LPG. The LNG FPSO will have storage capacity of 180 000 cubic meters of LNG and 30 000 cubic meters of LPG, and the first delivery is stipulated for mid 2011.

The project (Pre-FEED) is managed and owned by Höegh LNG, with Aker Yards performing the work for the FPSO hull, containment and utility systems, and ABB Lummus Global doing the design work for the gas treatment and processing plant as well as the liquefaction and LPG plant. Agreements with contractors for the LNG offloading, and mooring arrangements as well as the classification society will be completed shortly. The design for the containment system is Aker Yards and Aker Kværner’s proprietary new Aker Double Barrier Tank LNG containment system., and the liquefaction technology is based on ABB Lummus Global’s proprietary “NicheLNGsm Turbo Expander” system. The Pre-FEED will take 4-6 months to complete.



blog comments powered by Disqus

 





Latest Marine News and Technology Articles | Maritime 2012 Buyer's Guide





MarineTalk

E-mail: 

Copyright © 1998 - 2012 MarineTalk
Division of Link Internet Business Solutions
All rights reserved.

The reproduction, retrieval, copying or transmission of this Web site content,
in whole or in part, is not permitted without the express permission of
MarineTalk .